Close

Turfan, Xinjiang: Construction of the first pumped storage power station begins

2024-10-21 State Grid Turfan Power Supply Company HaiPress

TURFAN,China,Oct. 21,2024 -- On October 21,at the foot of EastTianshan Mountain in Shanshan County,Turfan,Xinjiang,the first pumped-storage power station project of Turfan,Xinjiang Huadian Shanshan pumped-storage Power Station project,entered the construction state.

In recent years,Turfan City has made every effort to build a new energy base of 10 million kilowatts,and promoted three pumped storage projects with an installed capacity of 4 million kilowatts into the national and autonomous region planning. The Xinjiang Huadian Pumped Storage Power Plant project is the first pumped storage power plant project approved in Xinjiang in 2024,and the sixth pumped storage power plant project approved in Xinjiang.

The planned installed capacity of the power station is 1.4 million kilowatts,the total investment is 11.5 billion yuan,the planned construction period is 72 months,the designed annual power generation is 1.75 billion KWH,and the annual new energy consumption can be promoted to 2.3 billion KWH,which is equivalent to saving 650,000 tons of standard coal and reducing 1.75 million tons of carbon dioxide.

In order to promote the grid connection of the power station,State Grid Turfan Power Supply Company has set up a special service team,established a normal communication mechanism with the power station construction party,made the preliminary planning of the supporting grid-connection project in advance,provided professional service guidance during the construction of the power station,and tracked the construction progress of the power station to ensure that the supporting grid-connection project was completed in advance and the power station was put into operation on schedule. To create favorable conditions for promoting the construction of a new power system and ensuring clean energy delivery in Xinjiang.

Disclaimer: This article is reproduced from other media. The purpose of reprinting is to convey more information. It does not mean that this website agrees with its views and is responsible for its authenticity, and does not bear any legal responsibility. All resources on this site are collected on the Internet. The purpose of sharing is for everyone's learning and reference only. If there is copyright or intellectual property infringement, please leave us a message.
©copyright 2009-2020 Auto Daily Report      Contact Us   SiteMap